Self-levelling floor screed pump

The CLB18 is an innovative screw pump for self-levelling screeds designed by Bunker to satisfy modern floor layers’ requests. Its theoretical output is 300 l/min and its maximum pumpable grain size is 16 mm, the CLB18 ensures high productivity and safety pumping easily at amazing distances.
Its small dimensions and its weight under 750 kg allow you a safe towing on roads and motorways even at 120 km/h and facilitates on-site positioning. With its resistant Alko tow bar, you’ll tow it easily even at high speed.
From today, pumping mortars and self-leveling concrete or spraying concrete is even easier with the CLB 18
Aplicações
It pumps and sprays:
- cement-based or anhydrite-based self-levelling floor screed
- mortar
- light concrete with polystyrene
- self-compacting concrete
- fluid fibre-reinforced concrete
- wet sprayed concrete
Características técnicas
Its Kubota 4 cylinders engine is ecological and powerful (26,5 kW) with E-TVCS system. Its engine slowdown system, its radiator and hydraulic pump with variable output reduce fuel consumption, improve its performances and parts’ lifetime.
It’s very easy to operate in either forward or reverse enabling the pressure in the hoses to go down in case of clogging.
The CLB18 is equipped with a remote control with electric wire to start and stop pumping. A wireless remote control is available on demand.
Gradual output control ensure precise pumping and spraying avoiding waste of material.
The CLB18 has been created to work in heavy-duty conditions guaranteeing the operator’s safety. The automatic screw stop, the emergency stop button, the control levers with safety block, light diodes and sound alarms ensure a perfect control of the pump.
When pumping stops, the decelerator automatically slows down the engine, reducing fuel and noise.
The pressure washer available on request is designed to work directly from the hydraulic circuit of the CLB18, this allows you to quickly wash your CLB18 and other machinery on site quickly.
CLB18 | |
---|---|
Diesel Kubota 4 cylinders engine | 26,5 kW |
Bomba tipo parafuso | 2 L8 |
Maximum theoretical output * | 18 m³/h |
Pressão teórica máx. | 25 bar |
Granulometria max | 16 mm |
Altura servida * | 200 m |
Distância servida * | 50 m |
Capacidade da tremonha | 200 l |
Air compressor | 400 l/min |
CLB18 total weight | 750 kg |
* Depends on material, consistency and hose diameter.
SALÃO INTERNACIONAL DE TECNOLOGIAS PARA CONSTRUÇÃO CIVIL
Site: saiebologna.it Outubro 19-22, 2022 Bologna - Italy Pavilhão 29, Stand D01 #SAVETHEDATE De 19 a 22 de outubro de 2022 a SAIE, Feira da Construção, regressa a BolognaFiere com um formato de exposição renovado, que valoriza produtos e soluções para a construção e engenharia de instalações, com vista
GIC-EXPO – Dias italianos de concreto
Site: gic-expo.it 28-30 Abril 2022 Piacenza - GIC-EXPO; Pavilhão 1 - Stand E48
The Big 5 – International Building & Construction Show
Site: thebig5.ae 12 a 15 de setembro de 2021 World Trade Center – Dubai; Pavilhão 4 – Estande 4C171
Batimat International building exhibition
November 7-12, 2011 Paris expo Porte de Versailles, Paris Francia Hall 4, Stand B162
A brand new monastery
Located on the slopes of Colle Sant’Elmo, the monastery of the Suor Orsola Benincasa institute dominates the entire town and gulf of Naples. The monastery has been built in the 16th and 17th century and is made of eight large buildings. It now hosts a university, the only active
The B100 concrete pump into nature and history
On the Amalfitan coast, in one of the most beautiful and fascinating places of Italy, two B100 concrete screw pumps from BUNKER are at work. The Amalfitan coast is one of the most beautiful sea resorts in Italy, not only the luxuriant nature contributes to make those places wanted
A question of synchronism
The renovation program of Italian railway tunnels plans to provide them with safety cables : there is one difficulty : all works have to be done without interrupting totally the railway traffic. The Italian railway has been for a long time a very frequent topic in the media due
A giant with fragile feet
Naples provincial underground offices have been adapted to antisismic standards. The recently voted antisismic law drastically changed the dangerous area map and several problems for public buildings arose. Buildings that have indeed been constructed in the 50ies - 70ies were generally of a low quality which was widespread at
Restauração de viaduto na auto-estrada Gênova-Livorno
Visitamos uma obra de manutenção extraordinária na auto-estrada A12 Gênova-Livorno, no noroeste da Itália. A obra foi confiada à construtora Giuseppe Iorio, de Caserta, especializada em intervenções em estradas (a maior parte no setor público, com uma especial vocação para restauração, reabilitação e reforço de viadutos) que opera no
B100 XP recebe menção no Prêmio “Costruire” 2007
O prestigiado júri do Prêmio Costruire atribuiu uma menção especial em sua edição 2007 à unidade móvel de bombeamento para argamassa e cimento B100 XP, da Bunker Teksped, selecionada entre as inúmeras novidades apresentadas no Salão Internacional para a Construção Civil (SAIE) de Bolonha, na Itália. A
Revoluçao nos tempos e no modo de trabalhar nos canteiros de obras
Cada vez mais, as construtoras estão se orientando rumo à máquinas versáteis e polivalentes, que permitam amortizar o investimento inicial de uma obra com maior facilidade. A B100 XP, último lançamento da fabricante italiana Bunker-Teksped, é a inovadora unidade móvel de bombeamento, a total funcionamento hidráulico, com regulagem da
Restauração e conservação dos abrigos portuários no píer Angioino de Nápoles
A visita da Redação ao canteiro de obras do porto de Nápoles, onde a Società Stazione Marittima Scarl está utilizzando uma rebocadora S8 EV da Bunker para a recuperação dos abrigos portuários gravemente deteriorados. Os abrigos portuários possuem 300 metros de comprimento, 10 metros de largura e 7 metros
A small yet big water purifier
Capri, situated in the Gulf of Naples, is one of the most famous islands in the world, there is of course a large touristic interest and each year the impact of dozens thousands tourists on the water main is impressive. Therefore, the town council decided to build a water
A B100 nas pistas dos Jogos Olímpicos de Turim 2006
Em 1999 nascia em Turim, na Itália, o Comitê para a Organização dos XX Jogos Olímpicos de Inverno de Turim (Toroc), o qual, junto à Agenzia Torino 2006, organizou em quatro anos as atividades para a construção das instalações esportivas e das infraestruturas olimpicas necessárias para a realização dos
B100 na Antártida – Ultrapassando limites
Durante a XXIII Expedição Italiana na Antártida, realizada entre 2007 e 2008 no âmbito do Programa Italiano de Pesquisas na Antártida, o píer de atracagem de barcos da Estação Científica italiana “Mario Zucchelli” foi restaurado. As diversas fases de realização da obra incluiram a execução de cinco aplicações de